Top Golf 

Gold Coast, Australia

By using Helix® Micro-Rebar™ reinforcement to replace mesh, the builder was able to reduce overall steel costs by 59%.

– Reuben Ramsey

 

Project Summary

 

Category:                 Commerical
Contractor:             Helix Australia
Location:                 Gold Coast, Australia
Application:           Slab on Grade

Original Design:  90 mm SOG with mesh
Helix Dosage:       90 mm SOG with 9 kg /m3

 

 

 

             

 

 

Helix® Micro-Rebar™ reinforcement has been used to pour the slab of Australia’s first Top Golf attraction on the Gold Coast in Queensland. The $35 million-dollar facility, due to open mid 2018, is a joint venture development between Village Roadshow and US-based Top Golf on a fifteen-acre site adjacent to Warner Bros. Movie World. 

 

Helix® Micro-Rebar™ reinforcement replaced all mesh in the 90mm thick external slab with a dosage of just 9 kg/m3. This removed the need for a concrete pump and saved the builder a massive 59% in steel costs, while also shaving a significant amount of time off the project.

 

Commercial Projects

  • Facebook - White Circle
  • Instagram - White Circle
  • LinkedIn - White Circle
  • Twitter - White Circle
  • YouTube - White Circle

Helix Steel | 2300 Washtenaw Avenue, Suite 201 | Ann Arbor, MI 48104 | 734-322-2114

© Helix Steel