TCC – Hazel Park MI

Tri-County Commerce Center III

Hazel Park, Michigan

The Helix Advantage

42% SHEAR STRENGTH
17% DURABILITY
18% MOR
Category

Industrial, Commercial

Owner

TCC – Hazel Park MI

Helix Dosage

9 lb/yd3 of Helix 5-25

Contractor

Fessler and Bowman

Ashley Capital/Oliver Hatcher once again partnered for the construction of this large building and Fessler & Bowman performed the concrete work.

The three buildings of this 120-acre site are situated on the northwest corner. The first building was completed in the spring of 2017; the second building in the fall of 2019; and the third building in 2020, bringing the total size of the park to 2.1 million square feet.

Notice the clean early entry saw-cuts applied by the contractor.

Case Study - Ashley Capital Respected for Faster Builds and Quality Results - Helix Steel

Case Study: Ashley Capital Respected for Faster Builds and Quality Results

“We were facing an impossible schedule given traditional construction methods,” says ​Ken Bowen, the retired former V.P. of Construction at…