This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Helix Steel was used to fully replace all of the #6 rebar cages in 53 piles.
Category
Infrastructure
Application
Contractor
Manson Construction
Original Design
30” diameter piles, 8- #6 and #3@12’’ hoops
Helix Dosage
25 lb/yd3 and 31.5 lb/yd3
Pier 57 is a Seattle waterfront location favored by tourists and locals. It was lengthened to construct a 156 ft diameter Ferris wheel which opened in 2012. Helix® Micro Rebar™ reinforcement was incorporated into the project design to fully replace the #6 rebar cages inside 53 piles. This application allowed the owner significant reduction in material and labor cost.
A total of 980 yd3 of concrete were placed by Manson Construction, pumped by Conco Pumping with concrete supplied by Cal Portland of Seattle. There were 23,420 lb of Helix® Micro Rebar™ reinforcement added into the concrete at the batch plant that replaced all of the structural rebar cages.