The Helix Advantage
117%SHEAR STRENGTH
25%DURABILITY
10%MODULUS RUPTURE
3%BENDING MOMENT
20 DAYSTIME SAVED
Category
Industrial, Commercial
Contractor
Park Avenue Construction
Owner
Allied Properties
Helix Dosage
9 lb/yd³ for the parking area
13.5 lb/yd³ for the drive aisles.
Helix 5-25
Park Avenue Construction built this 300,000 square foot logistics centre similar to a previous project they had completed for Allied Properties. To ensure the highest efficiency of the slab, Helix Micro Rebar was used at two different doses: 9 lb/yd³ for the parking area and 13.5 lb/yd³ for the drive aisles.

Case Study: General Contractor Saves Time and Money with Helix Steel’s Concrete Reinforcement
Every month, 200,000 transport trucks cross the border from Mexico into Laredo, Texas using the city’s four international bridges. Each…