Copper Wire Stripper Warehouse

Copper Wire Stripper Warehouse

Canada, Ontario

With a similar cost to traditional reinforcement along with labor and time savings, Helix made a big difference on this project. We estimate that we saved around 20% in time savings over using the wire mesh.

— Ken VanCasteren, Project ManagerTilt Wall Ontario Inc.

The Helix Advantage

170%Shear Strength
30%Durability
21%Modulus of Rupture
11%Bending Moment
20%Total Construction Time
Category

Commercial

Contractor

Tilt Wall Ontario Inc.

Original Design

6" x 6" W5.5 Mesh

Helix Dosage

9 kg/m3

When a new warehouse was needed in Woodstock ON, Tilt Wall Ontario was selected to not only meet the schedule expectations for the 10,000 sq. ft. warehouse, but also to help reduce the sound of the machines running due to residential houses nearby. By utilizing insulated tilt panels and Helix 5-25 in the exterior wythe, both expectations were exceeded.

Learn more about this project

Helix - Case Study - Park Avenue Construction

Case Study: General Contractor Saves Time and Money with Helix Steel’s Concrete Reinforcement

Every month, 200,000 transport trucks cross the border from Mexico into Laredo, Texas using the city’s four international bridges. Each…

Read More