This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
With a similar cost to traditional reinforcement along with labor and time savings, Helix made a big difference on this project. We estimate that we saved around 20% in time savings over using the wire mesh.
— Ken VanCasteren, Project ManagerTilt Wall Ontario Inc.The Helix Advantage
Category
Commercial
Application
Contractor
Tilt Wall Ontario Inc.
Original Design
6" x 6" W5.5 Mesh
Helix Dosage
9 kg/m3
When a new warehouse was needed in Woodstock ON, Tilt Wall Ontario was selected to not only meet the schedule expectations for the 10,000 sq. ft. warehouse, but also to help reduce the sound of the machines running due to residential houses nearby. By utilizing insulated tilt panels and Helix 5-25 in the exterior wythe, both expectations were exceeded.
Case Study: General Contractor Saves Time and Money with Helix Steel’s Concrete Reinforcement
Every month, 200,000 transport trucks cross the border from Mexico into Laredo, Texas using the city’s four international bridges. Each…