Landmark Hospital

Missouri

Reduced Carbon Footprint by 41 tons and increased Speed of Construction by 15 days.

 

Project Summary

Landmark Healthcare Facilities LLC is a leader in providing full-service physician office buildings, clinics, ambulatory care and surgery centers, cardiac and cancer centers, imaging centers, and laboratories. Landmark has been helping take care of people all across the country with their dedication to costumer service and reliability. The facility that was completed recently was used on the floors for another one of their office buildings.

 

Helix Steel was able to replace the original design of 4.5” section with 1 layer of W2.0 bars at 5.7” with a 4.5” section with 9 lb/yd3 of reinforced concrete.

 

 

Category:                 Commercial
Contractor:             Hoffman Construction Company
Location:                 Missouri
Application:           Slab on Metal Deck
Original Design:  4.5” thick section, 

                                   1 layer of W2.0 bars at 5.7”

Helix Dosage:       4.5” thick section, 

                                   9 lb/yd3 or 5 kg/m3  

 

 

 

             

 

 

       

ADDED HELIX STEEL VALUE

Increase in Shear Strength:               177%

Increase in Modulus of Rupture:    3%

Increase in Durability:                        15%

Increased Speed of Construction:   15 Days

Reduction in Carbon Footprint:     41 Tons

Commercial Projects

  • Facebook - White Circle
  • Instagram - White Circle
  • LinkedIn - White Circle
  • Twitter - White Circle
  • YouTube - White Circle

Helix Steel | 2300 Washtenaw Avenue, Suite 201 | Ann Arbor, MI 48104 | 734-322-2114

© Helix Steel