Wind Farm

Macarthur, Victoria. Australia

XXXX

Year Completed

Project Summary

Description

The Macarthur Wind Farm has the capacity to generate enough clean, green energy to power the equivalent of approximately 220,000 average Victorian households and also save approximately 1.5 million tons of greenhouse gases each year.

Although the original design consisted of N24 bar at 140mm each way for shrinkage control, cracking was a major concern. Thus Leighton Constructions turned to Helix Steel to three dimensionally reinforce 140 base structures and provide unparalleled pre-crack capabilities.

Category

Infrastructure

Location

Victoria. AUS

Original Design

N24 bar at 140mm each way #8@6” OCEW

Contractor

Leighton Constructions

Application

Wind Turbine Foundation

Helix ® Dosage

18 kg/m3 or 30 lb/yd3

Increase In Shear Strength:

Increase In Modulus of Rupture:

Increase In Durability:

Increase Construction Speed:

Reduction In Carbon Footprint:

70%

11%

50%

2 Days

2 Tons

Copyright by Helix ® Steel, Micro-Rebar™ reinforcement. All Rights Reserved. The data relating to real estate on this website comes in part from the company and external databases. Information about the projects includes the location of the same unless it's confidential. This project representation is based in whole or part on data generated by either the project owner or one of its contractors which assumes no responsibility for its accuracy. The materials contained on this page may not be reproduced without the express written consent, communicated to our office.