Wakefield High School is one of three public high schools located in Arlington, Virginia, closely bordering Alexandria. As part of the county's school board modernization process, Wakefield High School was approved to receive a new facility.

Century Concrete was selected as part of the construction team. By using Helix Steel, Century Concrete was able to replace the wire mesh reinforcement in the Slab on Grade and each respective Slab on Metal Deck. Saving time, reducing carbon footprint and providing for a stronger, three-dimensionally reinforced concrete product.

Category

Commercial

Location

Arlington, VA

Original Design

6” SOG with 6x6, 2.9W x 2.9W. 5.25" SOMD with 6x6, 2.9W x 2.9W. 4.5" SOMD with 6x6, 1.4W x 1.4W. 4" SOMD with 6x6, 1.4W x 1.4W

Contractor

Century Concrete

Application

Slab On Grade & Metal Deck

Helix ® Dosage

SOG and each SOMD, removed all mesh with a 9 lb/yd3 or 5 kg/m3

Increase In Shear Strength:

Increase In Modulus of Rupture:

Increase In Durability:

Increase Construction Speed:

Reduction In Carbon Footprint:

192%

18 %

22%

30 Days

245 Tons

Copyright by Helix ® Steel, Micro-Rebar™ reinforcement. All Rights Reserved. The data relating to real estate on this website comes in part from the company and external databases. Information about the projects includes the location of the same unless it's confidential. This project representation is based in whole or part on data generated by either the project owner or one of its contractors which assumes no responsibility for its accuracy. The materials contained on this page may not be reproduced without the express written consent, communicated to our office.