Description

The Durango-Mazatlán Highway sector is built in a mountainous area are therefore there is a total of 61 tunnels, adding over 18,000 linear meters, and 115 bridges, with more than 10.700m length. These tunnels and bridges join the already operating highway sections that have been built in different stages. Among the tunnels, the most important is the so called "Sinaloense Tunnel", the longest of all, is 2,800m in length.

Helix Steel Twisted Steel Micro-Rebar™ reinforcement was used in shotcrete applications across this tunnel system. The contractor was very pleased with the Helix Steel, from the workability and flow through the pipes and nozzle and found its rebound characteristics were excellent. The Helix Steel reinforced shotcrete mix was mixed via ready-mix trucks and applied using a robotic shotcrete system.

Category

Underground

Location

Mazatlan, MX

Original Design

Confidential

Contractor

Tecnor

Application

Shotcrete

Helix ® Dosage

9 lb/yd3

Increase In Shear Strength:

Increase In Modulus of Rupture:

Increase In Durability:

Increase Construction Speed:

Reduction In Carbon Footprint:

194%

18%

22%

7 Days

33 Tons

Copyright by Helix ® Steel, Micro-Rebar™ reinforcement. All Rights Reserved. The data relating to real estate on this website comes in part from the company and external databases. Information about the projects includes the location of the same unless it's confidential. This project representation is based in whole or part on data generated by either the project owner or one of its contractors which assumes no responsibility for its accuracy. The materials contained on this page may not be reproduced without the express written consent, communicated to our office.