Bridge Deck Replacement

Kansas City, Missouri. USA

XXXX

Year Completed

Project Summary

Description

Since 1967, Phillips Hardy's mission has been to deliver projects on time and on budget while leveraging their expertise in a quest for innovation to bring value to their customers. One of Phillips Hardy's customers has been dealing with aging bridge infrastructure, resulting in increasing construction demands and funding shortfalls.

Phillips Hardy set out to find ways to make infrastructure more resilient, enabling longer lifespans and lower lifecycle costs, while supporting higher traffic demands. That search led them to Helix Steel and its Twisted Steel Micro-Rebar™ reinforcement technology.

By incorporating Helix® Micro-Rebar™ reinforcement into this project, the customer was able to repair the existing bridge deck as opposed to a full replacement of the bridge deck. This process extends the lifespan of bridges that are in need of repair, at a fraction of the cost of a complete deck replacement.

Category

Infrastructure

Location

Kansas City, MO

Original Design

Low Slump Concrete

Contractor

Phillips Hardy

Application

Bridge Deck Repair

Helix ® Dosage

MoDOT Concrete Mix with 80 lb/yd3

Increase In Shear Strength:

Increase In Modulus of Rupture:

Increase In Durability:

Increase Construction Speed:

Reduction In Carbon Footprint:

1,132%

42%

142%

Confidential

Confidential

Copyright by Helix ® Steel, Micro-Rebar™ reinforcement. All Rights Reserved. The data relating to real estate on this website comes in part from the company and external databases. Information about the projects includes the location of the same unless it's confidential. This project representation is based in whole or part on data generated by either the project owner or one of its contractors which assumes no responsibility for its accuracy. The materials contained on this page may not be reproduced without the express written consent, communicated to our office.